Language : English 中文
Automatic laundry powder production line

News

Home

News

  • 10T/H Liquid Detergent Project Equipment Shipping
    10T/H Liquid Detergent Project Equipment Shipping
    May 16, 2024

    ON May 13th, all goods and equipment of 10T/H Liquid Detergent Project Equipment are packed into containers.   For each time when products are shipping, a special team specifically for shipping matter from Anhuimingzhi is always presented at the port. To monitor packing and communicate with forwarder ensuring that all of our client's goods and products are safely stored in the storage house, and securely packed into all containers.    All equipment are in good hands and we have been constantly doing so for many years. From our in-house manufactured equipment to procured standard goods, such as instruments or raw material like stainless steel or fire resistance material, everything will be packed into containers under our team's close monitoring and checking.      

    Read More
  • A Little Peak at Our factory After the Holiday
    A Little Peak at Our factory After the Holiday
    May 06, 2024

    A little tour around our workshop after the May 1st holiday. Workers are non-stop working in the factory, having multiple product fabrication processes ongoing. Not only it's our attitude towards our client: always making washing powder equipment at full speed to guarantee the delivery time while also ensuring quality; on the other hand, maximizing our production capacity is one of our responsibilities.    For instance, an already finished tank, and one of the mixers. And there is a mixer is in the process of production and, another belt conveyor is in the late stage of fabrication.   We will always be responsible for our clients, the products, and everyone around us. For any additional information and videos, please feel free to visit our Youtube channel: https://www.youtube.com/@anhuimingzhi        

    Read More
  • 15T/H Washing Powder Project Installation is Ongoing
    15T/H Washing Powder Project Installation is Ongoing
    Apr 30, 2024

      IT's been one month since our technician and workers arrived at the 15T/H Washing Powder project site, and they started the work immediately upon their arrival. It is clear that the tanks in the tank farm and spray tower were their first task carried out, and along with other works were undergoing at the same time.   Our team in China has been following up with on-site project manager, monitoring and caring about their daily life, safety, working progress, the satisfaction of the client and the completion rate of each stage, etc. It is overall satisfactory, so far, the work progress as well as the products quality is approved and praised by the client as well. We keep daily communication with our on-site team, the reports of recent work from on-site is executed on a daily basis and weekly basis.   The results speak for themselves, the progress of the tank's production is about to be finished soon and shall be moving onto the next stage. We believe our on-site team can keep this pace, showing their professionalism and making much more achievements. 

    Read More
  • Our Youtube Channel is Now Online
    Our Youtube Channel is Now Online
    Apr 23, 2024

    NOW, Anhuimingzhi YouTube channel is officially online!! You can find videos & short clips about our products, working sites, how we fabricate equipment and how the machinery operates, etc. It will be another window for illustrating what we do, showing what we are good at, and displaying where our strengths are. It also provides you with the most intuitive way to showcase of what we are capable of.   We will keep posting related videos & short clips on our channel and please feel free to subscribe and give away your likes. A quick link is listed below: https://www.youtube.com/@anhuimingzhi You can also access our Youtube channel via the link at the home page, scroll down to the bottom, and find the link under "social sharing".    

    Read More
  • 1st Batch Installation Team Is In Position
    1st Batch Installation Team Is In Position
    Apr 12, 2024

    AT the beginning of April, as the EPC contractor of 15T/H project, AnhuiMingzhi has sent a team of 1 engineer and 8 workers as the first batch to the project site in Iran for carrying out the washing powder production line installation works. Upon the team's  arrival, they have received warm welcome from our dear friend and esteemed client, which was highly appreciated and respected.    The team quickly blended in with local manpower and carried out the work immediately the next day, including daily meetings, work reports, on-site fabrication and installation etc. So far, the team leader was praised by our client and all works are ongoing as planned and scheduled.    

    Read More
  • Mozambique 10T/H Project Newest Progress
    Mozambique 10T/H Project Newest Progress
    Apr 08, 2024

    MOZAMBIQUE detergent washing powder EPC project is an upgrade case where the client wish to expand the capacity from 5t/h to 10t/h. And it was again carried out by Anhuimingzhi Chemical Equipment Engineering Co.Ltd.   With our professional and well experienced engineers, and skilled workers, the project is ongoing as planned. For instance, the tank farm is completed, and the tower was also installed and finished, the post-blending mixer is in position as well.    It is soon expected to have the production line debugged in the next couple of months. We cannot wait till the completion of this production line and have it put in use, make great outcome and achievements out of it.      

    Read More
  • Visiting Ongoing 15T/H Detergent Powder Project Site
    Visiting Ongoing 15T/H Detergent Powder Project Site
    Mar 06, 2024

    AT the beginning of 2024, our team of three people visited the project site at the invitation of the client and ultimately evaluated the preparation work before installation.   Upon arrival, the client greeted us with a wonderful breakfast and a warm welcome. In the following days, we traveled to the project site, visited and evaluated the current conditions of the existing structure of the 15T/H detergent powder project, including the main building itself, the road and pavement, and the electricity preparation on each floor, etc. Visits to adjacent workshops such as sulfonation production lines have also been paid.    Multiple meetings regarding the preparation work have been held, friendly discussions and negotiation were carried out and many subjects and matters have been settled through the meetings. It was an overall very productive 4-day trip, we were glad seeing our clients and friends.       

    Read More
  • Our Beloved Client Visited Our Factory& The City
    Our Beloved Client Visited Our Factory& The City
    Oct 30, 2023

    In October 2023, One of our beloved client Pakshoo, from Iran has visited our factory and the city.   This trip lasted more than a week from the end of October to the begining of November. They have gave us great praise to our work, products, facotry and services. It certainly is our pleasure to host such wonderful guests and friends in Hefei. Throughout the journey, we have encountered friendly meetings, negoiations and a wonderful trip; as a result, more work have been settled and consensus and aggreements have been reached.     In addition to this successful trip, the honor is ours to have this opportunity to get knowing each other better and deeper. We are glad to have chances to serve respected themselves and their estemeed company.    We look forward to welcome them again in China and long lasting the business partnership.    

    Read More
1 2
A total of2pages

Leave A Message

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Submit

Home

Products

whatsapp

contact